Waukegan Harbor Pier
Client: United States Army Corps of Engineers

PROJECT DESCRIPTION

Foundation Mechanics completed on time, in accordance with contractual obligation, resurfacing the Waukegan Harbor South Pier utilizing concrete, rebar, and metal plates. The Inner Harbor water depth along the South Pier is approximately 23-feet or less in depth. This operation required the contractor to have barges and tugs to maneuver the equipment necessary since the pier itself extends approximately 3,150' into the harbor/water in Waukegan.